Muskogee First Assembly Phase 1: Children’s Addition

GH2 was engaged by Muskogee First Assembly for a Children’s Addition project. Prior to starting that project, our team decided it was imperative to design a master plan for the entire campus with future phases for growth. The final master plan includes four phases, of which Phase I Children’s Addition has been completed and we have conceptually designed Phase II New Entry and Lobby. Future Phase III is a fitness center and Phase IV is a proposed chapel to be used for smaller more intimate events.

PROJECT FACTS

Location

Muskogee, Oklahoma

Size

Similar Projects:

View 5View 5

Transformation Church

Transformation Church
StCrispins2019GH2-250_smStCrispins2019GH2-250_sm

St. Crispin's Summer Camp and Conference Center

St. Crispin's Summer Camp and Conference Center
Asbury DC Exteriors-8_smAsbury DC Exteriors-8_sm

Asbury United Methodist Church Venue 68

Asbury United Methodist Church Venue 68